BWTS
EGCS
3D SCANNING
Throughout the entire process we use advanced software solutions and combine modern design tools with expertise based on well over a decade of experience.
Seatech provides a wide range of retrofit solutions and complex technical support for the process of modification, including inspections, 3D laser scanning, supervision, retrofit design, preparing of workshop documentation, creating 3D models of selected assembles. We create customized solutions and assist at all stages of the process.
Implementation of the Ballast Water Treatment System onboard ships has become very important to ensure complementarity with the rules and regulations established by the IMO. Several factors are taken into account while meeting the ballast water management challenges, as we aim to deliver high-quality BWTS retrofit solutions and assure our client with the most suitable one.
Carnival Corporation & plc
Exhaust Gas Cleaning System
type:
cruise vessels
conversion years:
2019 – 2020
A Vast Range Of Vessels
CARNIVAL DREAM | 2020 | Seatech Scope of Work: CONFIDENTIAL |
CARNIVAL INSPIRATION | ||
CARNIVAL SUNSHINE | ||
CARNIVAL VALOR | ||
CARNIVAL ECSTASY | 2019 | |
CARNIVAL SPLENDOR | ||
CARNIVAL SENSATION |
NORDBAS – Nordnes Group
Exhaust Gas Cleaning System
type:
stern trawler
conversion year:
2020
Modifications and intergation
Principal dimensions | NORDBAS |
Year of Build: | 1979 |
Gross Tonnage: | 893 |
Flag: | Norway [NO] |
SEATECH scope of work: | Propulsion line exchange – 3D modelling and design package: – main hull structure – cloud points – shape development – structure coordination in 3D |
IMO | 9137765 |
FESTOSS PALACE – Grimaldi Minoan Lines
Exhaust Gas Cleaning System
type:
cruisers
conversion year:
2019
Connecting 4 scrubber towers in an open-loop system
Principal dimensions | FESTOS PALACE |
Year of Build: | 2001
former: Amiscora(2012) and Europa Palace(2002) |
Gross Tonnage: | 24 352 |
Guest Capacity: | 2 500 |
Registered Owner: | Minoan Lines Sg SA |
SEATECH scope of work: | Scrubber installation – full design package, including: – on-boardsurvey – 3D laser scanning – modelling – demolition plans – workshop documentation for steel structure and piping systems |
IMO | 9204568 |
KNOSSOS PALACE – Grimaldi Minoan Lines
Exhaust Gas Cleaning System
type:
cruisers
conversion year:
2019
Connecting 4 scrubber towers in an open-loop system
Principal dimensions | KNOSSOS PALACE |
Year of Build: | 2000 |
Gross Tonnage: | 24 004 |
Guest Capacity: | 2 500 |
Registered Owner: | Minoan Lines Sg SA |
SEATECH scope of work: | Scrubber installation – full design package, including: – on-boardsurvey – 3D laser scanning – modelling – demolition plans – workshop documentation for steel structure and piping systems |
IMO | 9204063 |
OCEAN BROTHER
BALAST WATER TREATMENT SOLUTION
type:
Cargo, Bulk Carrier
conversion year:
2017
Ocean Brother
Principal dimensions | OCEAN BROTHER |
Year of Build: | 2000 |
Gross Tonnage: | 16 963 |
Home port: | Valletta |
SEATECH scope of work: | BWTS Feasibility study |
IMO | 9237383 |
BOTHNIABORG
Exhaust Gas Cleaning System
type:
Ro-Ro Cargo
conversion year:
2015
Wagenborg
Principal dimensions | BOTHNIABORG |
Year of Build: | 2004 |
Gross Tonnage: | 12 635 |
Home port: | Delfzijl |
SEATECH scope of work: | Hybrid scrubber system Wärtsilä Feasibility study Workshop documentation 3D model |
IMO | 9267728 |
BALTICBORG
Exhaust Gas Cleaning System
type:
Ro-Ro Cargo
conversion year:
2015
Wagenborg
Principal dimensions | BALTICBORG |
Year of Build: | 2004 |
Gross Tonnage: | 12 635 |
Home port: | Delfzijl |
SEATECH scope of work: | Hybrid scrubber system Wärtsilä Feasibility study Workshop documentation 3D model |
IMO | 9267716 |